Current Lead Times
| Products | Standard Lead Time | Delay Status |
|---|---|---|
|
Off the shelf products All of our products which don't require prep or making up! |
1 - 3 working days
|
No delays expected
|
|
Grain & substrate All sterile grain and substrate containing products. E.g. Grow Kits, CVG, Wood substrates etc! |
3 - 5 working days
Slight delays, we should be caught up soon! - Chris
|
Up to 2 working days
|
|
Agar products Any product or bundle containing sterile pre-poured agar products (Plates, slants, pots etc!) We have a handy guide to getting your agar quicker below! |
1 - 8 working days
|
No delays expected
|
|
Liquid Cultures Our gourmet liquid culture syringes. |
3 - 5 working days
|
No delays expected
|
|
Mycelium on agar Cultures on agar plates. |
5 - 10 working days
|
No delays expected
|
|
Flow units Our business and home HEPA / ULPA filter units. |
15 - 20 working days
|
No delays expected
|
|
CanMate 23qt Pressure Canner Our new pressure canner! |
10 - 30 working days
These are ordered in batches. See the product page for next drop date.
|
No delays expected
|
|
150L Autoclaves Our beasty 150L autoclave which is the backbone of production at MycoPunks. |
40 - 50 working days
These are manufactured to order so have a longer lead time.
|
No delays expected
|
|
Unicorn Bags by the Box All Unicorn Grow Bag types by the box (typically 1000 per box) |
1 - 60 working days
These are ordered every 2-3 months, see the product page for next drop! - Chris
|
No delays expected
|
Ordering custom pre-pour agar
Pouring Day
We pour on Mondays and Wednesdays, if you put your order in before 9AM your order will be poured in that run. If you order after 9am Wednesday you will be in the Monday run.
Cooling / Drying (Day Three)
After pouring your agar order is left to dry in our ULPA flow cabinet for two days. The two day drying period minimises condensation on the plates before we shrink wrap.
Sealing / Q&A (Day four)
We go through final quality checks on the last day. Plates are shrink wrapped and air sealed inside our ULPA flow cabinet and are then passed over to the shipping team.
How to get agar as quickly as possible!
Order timing
Order before 9am on Monday or Wednesday and you'll be included in the pour run the same day. Monday ready to ship Wednesday | Wednesday ready to ship Friday.
Anarchy
Ordering our anarchy agar product means we will send you whatever mix we have in stock (IF WE HAVE OVERSTOCK). We won't ever send water agar or antibiotic agar.
No colour or "We choose" MEA
We try and carry overstock of Malt Extract Agar with no colour added at all times so you are more likely to get shipped out first with these options.
Things taking longer than stated?
We are a small team and sometimes things get a bit busier than expected (especially during holiday periods). We will always do our best to communicate delays or extended leadtimes. But if you think something might be wrong you can reach out to us below and we will get back to you asap.

